AEVORON/Sentinel Lift
NEXORA Production · artificial lift dispatch

Sees a failure before the stop. Shows which well matters most

Sentinel Lift brings the whole artificial-lift stock onto one screen: ESP, rod pump and plunger lift. The engineer gets more than an alarm: a likely cause, operating advice and the cost of delay in tonnes.

Sheet 05 / 17
Live console

Try a dispatcher's shift

Pick a well, open "Why this?" and approve the recommendation. The tonnes at risk fall as the queue clears.

Sentinel LiftDemo · simulated data
4need a decision
0t/d at risk
124wells normal
Lift types

The whole stock in one priority list

Statuses are shown as they are. New lift types connect to the same screens and data.

ESP · rolling out

Controllers and downhole gauges: current, insulation, intake pressure and temperature.

Rod pump · prototype

Dynamometer cards from controllers, portable units and paper. A pilot on a customer's field in year one.

Progressing cavity · planned

Torque, rotation speed and wear for viscous fluid and solids.

Plunger lift · planned

Cycle and pressure control in the same priority list.

What sets it apart

Dispatch that leads to a decision

Ordinary telemetry shows parameters. Sentinel Lift answers the shift's real question: what to do first, and why.

A queue by production at risk

Not hundreds of identical alarms, but a list of wells by tonnes at risk. The dispatcher sees where to go first.

One stock, any lift type

ESP, rod pump and plunger lift on the same screens and reports, whichever controller brand you run.

The cause, not just the alarm

Likely cause, confidence and operating advice. Every conclusion opens up to its inputs and model version.

Wells with no telemetry count too

Paper logs and photos of dynamometer cards go through FIELDPix into the same priority list.

Approval before action

The system recommends, the engineer approves. The decision goes to the journal and the well history with its author and time.

Run life and energy

Run life by manufacturer and pump size, energy per tonne, the cost of each stoppage.

Reviews in Connect

An alarm immediately opens a discussion on the well card with the right people from the shift roster.

From alarm to workover

A recommendation becomes a workover request, and the WRA result and repair report return to the well history.

Keeps working through outages

The gateway buffers data, Edge runs models on site. Deployed with us or on the customer's servers.

What it detects

Conditions, signs, recommendations

ConditionSigns in the dataRecommendation
Pump-offCurrent and load drop, temperature risesLower frequency, cyclic mode
Gas at pump intakeCurrent and intake pressure fluctuateChange mode, gas separator
Plugging, scaleCurrent rises while flow rate fallsFlushing, inhibitor
Insulation lossCable and motor insulation resistance fallsPlanned repair before breakdown
Motor overheatingWinding temperature risesReduce load, check cooling
Pump wearHead drops at the same frequencySchedule replacement
Rod pump: valve leaks, inflow, gas, pound, parted rodsDynamometer card shapePumping speed, stroke length, repair by priority

How it works

01

Controller, gauge, test separatoror a paper log

02

Industrial gatewayModbus, OPC UA, MQTT, 4G

03

AEVORON Coreservers in Tashkent or at the customer

04

Dispatcher and engineerscreen, alert, report
An estimate on your numbers

How many tonnes your downtime costs

Enter your own values. The whole formula is visible, and you set the reduction yourself: it is an assumption to discuss, not a promised result.

Production retained0 t/yr

Wells × failures × downtime days × rate × reduction. Based on your assumptions, not a guarantee. A pilot shows the real figure.

Next step

Start with one pad

A 1–3 month pilot: we connect the controllers, set the baseline and measure the effect in hours and tonnes. The final decision always rests with the engineer.